skip to main | skip to sidebar

SRT251Belinda Breheny

The Trade school facility at Box Hill Tafe was completed in 2007. Paul Morgan Architects designed it. The construction of the frame can be seen easily. The building is unusual in several ways. The roof cladding is used on the walls. The floor area has a section of sand which the trade students can use for practice. The building is very open and does not have walls on one end.

Wednesday, March 12, 2008

Section brick veneer wall.

Posted by SRT251 Belinda Breheny at 6:18 PM
Labels: Section brick veneer wall.

No comments:

Post a Comment

Newer Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2008 (14)
    • ►  June (3)
    • ►  May (2)
    • ►  April (6)
    • ▼  March (3)
      • Section portal wall.
      • Box Hill TAFE trade school facility.
      • Section brick veneer wall.

About Me

SRT251 Belinda Breheny
View my complete profile