Beams, purlins, bracing, mesh, sarking and some services can be seen.
This shows the holes in the upright where the floor was formerly. It also shows a join between 2 uprights. Much of the original steel work was rivetted.
The Trade school facility at Box Hill Tafe was completed in 2007. Paul Morgan Architects designed it. The construction of the frame can be seen easily. The building is unusual in several ways. The roof cladding is used on the walls. The floor area has a section of sand which the trade students can use for practice. The building is very open and does not have walls on one end.